How do I ensure my concrete floor is "flat" for laminate flooring? - flat floor for laminate
I fleet of about 800 square meters of bamboo over concrete. I cleaned the entire area of all floors above and fairly smooth. I try to ensure it is flat, but I do not know exactly how I this.i "read method" string ", but I'm not sure about how the culmination of an area as large (about 30 'x25'). The room has a wardrobe and a bathroom also (and) not only the place. I also read about using the rule (like a 2x4), but where research gaps at the 16 th of an inch, like a piece of 2x4 is not quite right, but if I ve enough "pieces" of wood properly.
More information: I have tried with the plastic fence to the soil moisture and the method that was fine. The plate is about 25 years and live in a dry atmosphere (San Diego), so I, I agree with the humidity and plan to provide a barrier against moisture 2in1 / foam padding utilization possibilities.
Any advice would be very grateful as I am eager to begin the implementation, the soil, but will not skimp on preparation work. Help!
Wednesday, February 3, 2010
Flat Floor For Laminate How Do I Ensure My Concrete Floor Is "flat" For Laminate Flooring?
Subscribe to:
Post Comments (Atom)
12 comments:
First, the water is filtered at the same level. Use a long, transparent tube (same tube used in the aquarium pumps) with enough water to measure the amount of points in several inches above the bottom walls. You can define one end of the tube in a lounge area, about 5 inches of water in the ground, then at the other end of the tube, the lock on the water marks are not the same 5 inches above the ground. Do the same for the room and in all areas of suspicion on the floor is not level. Then the measure has been marking points on the earth as close as possible. Use the same measure for all points. In theory, according to the points that are now standard. Drive a nail into each of these points and the chain of nails. Connect these lines in the nails through the creation of a network of channels. You will see on your floor is not level.
The next question is that you will encounter another problem in his home before the leaves? It may not be necessary if the ground is very uneven.
First, the water is filtered at the same level. Use a long, transparent tube (same tube used in the aquarium pumps) with enough water to measure the amount of points in several inches above the bottom walls. You can define one end of the tube in a lounge area, about 5 inches of water in the ground, then at the other end of the tube, the lock on the water marks are not the same 5 inches above the ground. Do the same for the room and in all areas of suspicion on the floor is not level. Then the measure has been marking points on the earth as close as possible. Use the same measure for all points. In theory, according to the points that are now standard. Drive a nail into each of these points and the chain of nails. Connect these lines in the nails through the creation of a network of channels. You will see on your floor is not level.
The next question is that you will encounter another problem in his home before the leaves? It may not be necessary if the ground is very uneven.
Do you want the maximum and minimum share capital of the telegraph thought the finished floor to receive.
Start by selecting the highlights. Get a good 2x4 straight and rub one side with a red lip gloss, a pen, Redwood. Drag the edge of the swatch, and the pen moves on the heights. Use a sharpening stone to rub on the floor ... Stacks are made with a handle on in this sense. You can save a lot of work to the highest points to be found, and some efforts to locally available. Try not start, the whole bottom of the wear on upgrade, only with the latter.
) After a few passes with it, with a good metal straight edge (like a long level, to identify vulnerabilities. After a bright light behind the rule helps to see the differences. Nickel is a 1/16th inch thick, so you're using, to measure the gap. Another good option is to put water on the floor, where it pools up (but you must see before dry) of soil
If victims are not all standards, complete with a leveling
Well, you can try a 6-foot level, or a business, a house Gagua heavy piece of aluminum mold buy right corner.
Of course, in a large room that you need to know that your basic level, let alone possible.
"Highlights" are areas not plagued by A-level. Minor depression can easily "floated" with a thin layer or similar basic type of mortar.
Certainly in this area have smaller areas operate simultaneously, as when installing any type of flooring, and all the "base" as the filler will certainly contribute to depression 1 / 16. Inches or less.
The "perfection" is a procedure that does not enjoy the "tolerance", "acceptance", some "minor chords", and finally, take the word and the end result of the process to achieve ". Without a doubt, is the perfection is an important area, "aim" for.
Steven Wolf
If your board is clean and smooth and have no peak filling is obvious and the outcome is likely to have to do anything and could not fix anyway. Sealing compound works, but for the local dives, cracks and holes ..
If you still want to check, use a marble or steel ball bearings of the same size and use a chalk line running on the network. Put the marble through the network and see if it flows quickly. He was shot in the hollows below the summit.
If your board is clean and smooth and have no peak filling is obvious and the outcome is likely to have to do anything and could not fix anyway. Sealing compound works, but for the local dives, cracks and holes ..
If you still want to check, use a marble or steel ball bearings of the same size and use a chalk line running on the network. Put the marble through the network and see if it flows quickly. He was shot in the hollows below the summit.
To use the string method, which requires a length of rope and a sharp tool called line level. The line cost to below $ 5.
What you do is an end of the rope on the wall at a certain level anchor, using whole numbers [If using 3 ', you can ensure a level of 4 ", you have to use a position perpendicular] to the bottom line hook level in the chain and with the help of an assistant, to extend the cord to the wall is. the string level anchor. You now have a range of spatial levels. Take your tape measure and measure the distance between the line into the ground along several points. signs on a sheet of graph paper, change locations and repeat if necessary. you'll find yourself with a topographic profile of your floor.
You really can not optimally placed on a concrete floor. You need a flat surface and not necessarily on the ground. I rolled on the concrete in my house, I have not checked, visually, with the exception of something really, okay.
If you really want, you can create a chain line in several places. The walls with a series of clips 3 cm of the soil. Since the plant at various locations along the chain, if there is more or less of what is out of tolerance.
THIS PERSON IS POSE OF THE EARTH. Although it is almost normal, only to ask where he bought the apartment, comes with complete instructions.
dosnt loops if it is not so that the cause of the word films openly on the wall or breaking of the joints thats enough in the installation that I have thousands of yards of this material made it very forgiving d a floor under crude --
Swimmer!
Pleni patches with
There is a hanging-level program, aluminum and light enough to hang next to a strong cord or wire. It is 5 inches long with hooks on the ends. It has seen the same tube with water to what the next step. For example, a hammer at the end of the chain on one side of the wall. Have someone hold the other end against the other wall. Block Block-level and ask your assistant to increase or decrease until the rope you see the air bubble in the plane stopped in the middle.
Therefore, we have a wooden mold. Make sure the pan level and the concrete is poured into the mold level, good!